Sector

Storage for plastics processing

Heating phases at machine start-up and parallel starts after breaks set the peak in injection moulding and extrusion.

4,074 kWp

PV by Equator Solar

3,923 kWh

Storage by Equator Solar

34

Storage projects by Equator Solar

15

Years of Equator Solar

Plastics and injection moulding

Machine heating and parallel starts set the peak, not the running process.

Injection moulding and extrusion machines draw their sharpest load while they heat barrels and dies at start-up, and that draw multiplies when several machines restart together after a shift break. Cooling runs underneath as a steadier load once the process is running. The peak that sets the capacity charge (Leistungspreis) therefore comes from start-up and not from the running process, and a load-profile analysis makes this visible.

Start-up heating

Sharpest peak, before the process itself is running

Parallel starts

Several machines restarting together after a break compound the peak

Load and delivery

How the load looks, and where to start

Typical load

Typical load pattern

Heater bands draw most at start-up, parallel starts after breaks add to it, and cooling runs underneath.

Battery inverters and charge controllers installed in a switch room

In plastics processing the load peaks before the process itself starts, because barrel and die heating draws more than injection or extrusion. Cooling forms a steadier band once the machines are running, and a load-profile analysis separates it from the start-up spike.

  • Heater bands at machine start-up cause the sharpest peak
  • Parallel starts after breaks compound several machines’ heating draw at once
  • Cooling runs as a steadier load once the process is underway
Where to start

Where to start

A load-profile analysis separates the start-up heating spike from the running-process load.

Engineers and site staff on a site visit next to a large water tank

Peak shaving addresses the start-up spike directly. Backup power matters for sensitive processes, where an interruption during a moulding cycle means the part has to be scrapped.

  • Peak shaving against the start-up heating spike
  • Backup for processes that cannot tolerate an interruption mid-cycle
Terms

Role and fee

The same independence rules and fee structure apply to every project in every sector.

One role per project

On every project we take one of two roles, never both. As independent advisor we are paid a fee, earn nothing on hardware and take no commission from manufacturers or installers. As turnkey partner we deliver the system through vetted installation partners under one contract. If we wrote the specification or evaluate the bids, we do not bid.

Fee

Load-profile analysis, feasibility studies, quote reviews and acceptance tests are offered at a fixed price agreed on the scope. Owner's engineering is billed by day rate or as a fixed fee. Turnkey delivery is a fixed-price contract.

The figures and references on this site are projects of Equator Solar Systems Ltd in East Africa. The contracting party for ZNX services is ZNX Energy GmbH.

Send us your load profile.